In the heart of London’s Trinity Square sits this breathtaking courtyard water feature. Fibreglass First was tasked in making 37, 14metre ‘blades’ which were installed in 2014/15. This development boasts of being the first 7-star hotel in the UK.
The blades were made complete with interior structural components to provide strengthening and to eliminate any torsional twisting. When assembled they had to be hoisted over the building and into place. The components we manufactured provided the necessary strength and rigidity to allow this to be achieved.